Skip to content

Changelog

What changed in Taiga

Dated the day they shipped, newest first. Follow the feed.

  1. Platform

    Taiga Chat Agent

    Ask an agent what a product's specification decided, what the code actually does, why last night's build failed or what to build next, and every answer says what it read.

    Read the entry →

  2. Discovery

    Eight documents, one run

    Discovery writes the whole document set from your specification in one run, marks every document a later edit leaves behind, and ends with a set the rest of the product can trust.

    Read the entry →

  3. Administration
  4. Initiatives

    The first backlog

    Import a codebase and the first backlog holds only the work a one-click fix on the Maintaining tab cannot cover: the missing capabilities behind its findings and policy gaps, checked against the code before they are proposed.

    Read the entry →

  5. Platform

    Factories and products

    Teams are now factories and projects are now products, and an organization runs as many factories as it needs, each with its own instructions and knowledge that every product in it builds on.

    Read the entry →

  6. Administration
  7. Runs
  8. Initiatives
  9. Administration

    Notification contacts

    An email address that belongs to a project, a team or the organization, rather than to a person, receives each action-required item raised in that scope, which is also how the inbox reaches a Slack channel.

    Read the entry →

  10. Operate

    Questionnaires

    Import the requirement spreadsheet a regulator or customer sent and Taiga answers what the project's documents support, each answer naming the document and version it rests on, written back into your own file.

    Read the entry →

  11. Initiatives
  12. Platform

    A new look

    The application sits on a new shell, with the content lifted onto a panel that scrolls on its own, and two more themes, Boreal light and Boreal dark, beside Midnight.

    Read the entry →

  13. Initiatives

    The factory line

    Line initiatives up and Taiga works them one at a time: it plans the first, builds it, opens a pull request, and now merges that itself once your rules allow.

    Read the entry →

  14. Discovery
  15. Discovery

    Look & Feel

    Taiga drafts nine design concepts, picks the combination that works together, and shows it as one screen you can change a piece at a time.

    Read the entry →

  16. Operate
  17. Operate

    The Policies tab

    Where a project stands against the policies you publish, with every gap carrying the control it contradicts and the passage from the document that shows it.

    Read the entry →

  18. Discovery

    Discovery

    The phase where a project gets defined has been reworked around the work you actually do in it: moving through the steps, reading and editing the documents it produces, and signing them off.

    Read the entry →

  19. Initiatives
  20. Platform

Security posture, subprocessors and the trust documents change on their own register: trust center updates.